REVIEW-37: XCI-28 Upgrade and replace tginfo with xdinfo - Test Readiness Review

Overview

This is a test readiness review for xdinfo. The xdinfo command line tool allows users view information from XSEDE central information services from the command line. xdinfo replaces the legacy TeraGrid tool, tginfo.

Review Summary

  • (Susan Litzinger) Provide tar and unzip instructions in install guide
    • Developer added
  • (Galen) Should srb be an information type?
    • No, it was removed from test plan sample
  • (Shava) Move some useful text from test plan to install guide and provide example of python-requests module
    • Added to install guide
  • (Shava) Add module test and fix example module
    • Test 1 added as a module test and module example fixed in source
  • (Shava) Clarify that how xdresourceid should be installed for testing
    • Instructions added
  • (Susan Lindsey) Broken links in install guide
    • Links will be populated once accepted for production and deployed at one site

Review Input Documents

Documentation

Review Criteria

Package information: All software packages (e.g., server and client packages) for this CI are listed.

Documentation and Installation instructions: The deployment plan for this CI on XSEDE is clearly described as well as the installation instructions and any XSEDE specific configuration instructions.

Test environment and facilities: The test environment needed to adequately to validate this component is described. Should indicate also whether testing can be performed within a VM and if not, the reasons for it.

Assumptions: Lists any assumptions needed before testing can begin (e.g., accounts needed).

Test procedures, cases, and scenarios: Lists the tests that should be run or an associated test suite and expected performance metrics if applicable.

Defect, issue, and risk reporting: Deployment plans should include defect and issue reporting information. The testing plan could reference that same information from the deployment plan, or provide alternate information if defects and issues need to be reported differently during testing. Risks, as well as defects and issues, should be part of the testing report.

Schedule

Current Date: 2023-06-08
Current Status: Closed (Test Readiness Review)
Target Date Actual Date Activity Milestone
  2017-01-24 Review launch date
2017-01-31 Written feedback due (Reviewers)
2017-02-02 2017-02-03 Written response date (Review Material Developers)
2017-02-03 2017-02-03 Final approval due and completion date (Reviewers)
Review Created: 2016-12-07 5:42 pm
Review Last Updated: 2017-02-03 2:06 pm

 

Reviewers

If you are a reviewer, please login to sign or withdraw from this review.

Required

  • Galen Arnold
    SIGNED: 2017-01-25 11:44
  • Susan Litzinger
    SIGNED: 2017-02-08 10:48
  • Shava Smallen
    VIEWED: 2020-10-05 12:13

Optional

  • Susan Lindsey

Review Material Developers

Eric Blau
John-Paul Navarro

Review Facilitator

Shava Smallen

 

Please post your comments using the "New topic" or "Post reply" buttons in the forum below.